| site master planning, open space planning, natural resource planning, design guidelines, feasibility analysis, renderings/ 3d modeling and animation, construction and bid document preparation, specifications, cost estimating, and construction administration. |
| as part of the Lewis and Clark Centennial Celebration, this Washington State Park scope included a new intersection on a difficult section of sr 14, a crossing over the Union Pacific Rail right-of-way, evaluation of environmental and visual impacts within the highly regulated Columbia Gorge, examining the grading, earthwork, and tree removal impacts, and preparing design guidelines for the bridge structure, grading/ landform configurations, and revegetation of native species. |